Sunday, January 24
We install the casing on the window, and now it's time to address the closet, which we've been ignoring in the push to get the plumbing and electric ready for final inspection.
We put in the last pieces of drywall, now that we no longer need access to the shower plumbing, and we have more taping, mudding and sanding to do. While the first coat of joint compound is drying, we make yet another pilgrimage to Home Depot, and in the rain we load up a van with our closet door. As an added bonus, on the way back, we are able to load the van up with $125 worth of unused stuff that we bought from the 'Depot and didn't need. We are a little soggy.
Monday, January 25
Since it has been raining, the joint compound is taking forever to dry, so not much gets done today.
But, it isn't all bad news... WE GET TO TAKE A SHOWER. It is like being in a rain shower, but not the same as when we were stuck in the rain at Home Depot, this is different and very very very very very nice. I could stay in there all day.
Friday, January 29, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment